Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (12-Mo Subscription Included)

Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (12-Mo Subscription Included)

$149.07
Sale price  $149.07 Regular price 

Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (12-Mo Subscription Included)

$149.07
Sale price  $149.07 Regular price 

About This

  • Enjoy peace of mind knowing your device comes with 12 months of subscription included. After 12 months, you can continue using the device with the flexible and transparent tariff plan you choose (check the product gallery to see the tariff plans).
  • NEVER LOSE YOUR CAT – Works Anywhere With 4G Sim - Real-time GPS tracking shows your cat’s exact location anytime, anywhere. iOS & Android app.
  • ULTRA-SMALL & LIGHTWEIGHT – The smallest waterproof tracker for cats, designed to be collar-compatible and comfortable for daily wear.
  • SMART ALERTS & GEO-FENCE – Get instant notifications if your cat leaves a safe zone.
  • LONG-LIFE RECHARGEABLE BATTERY – Up to 14 days on a single charge for worry-free protection.

Overview

  • Brand : PETLOC8
  • Special Feature : Alert Notification, Geo-Fence, Real Time Tracking, Waterproof (IP67) and collar-compatible device
  • Connectivity Technology : 4G LTE CAT 1, Bluetooth, Wi-Fi
  • Supported Application : iOS & Android App
  • Specific Uses For Product : Pet Monitoring, Cat Tracking

Benefits

Nourishing
Hydrating
Soothing

Won't clog pores
Lightweight

Cat GPS Tracker – Smallest Waterproof Pet Tracking Device with App, Real-Time Location, Smart Alerts & Geo-Fence, Long-Life Battery, Collar-Compatible – iOS & Android (12-Mo Subscription Included)

Our signature formula contains only the best ingredients, selected for max benefits to the skin.

Natural ingredients

Each product is made with carefully chosen ingredients that focus on your skin's health and glow. Every ingredient is picked for its effectiveness, helping you achieve the best results in your skincare routine.

Tested for safety

We prioritize safety in every product we create, ensuring peace of mind for you and your loved ones. Each item undergoes thorough testing, so you can trust that you're using safe and reliable solutions every day.

Fragrance free

Our products are fragrance-free, designed for those who prefer a gentle touch without added scents.

FRESH

Expert endorsed

FOR SENSITIVE SKIN

Vitamin rich

The best skincare routine is the one you can stick to. This formula feels so good, staying consistent won't be a chore.

Pairs well with