Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - 4G Built-in SIM - iOS & Android (Subscription Required)

Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - 4G Built-in SIM - iOS & Android (Subscription Required)

$37.21
Sale price  $37.21 Regular price 

Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - 4G Built-in SIM - iOS & Android (Subscription Required)

$37.21
Sale price  $37.21 Regular price 

About This

  • This Device Requires a Subscription. To start using it, simply select the flexible and transparent tariff plan that best fits your needs. Check the product gallery to see the tariff plans.
  • Real-Time GPS Tracker works anywhere with a 4G SIM, keeping your dog safe — know their exact location anytime through the Petloc8 app. iOS & Android.
  • Collar-compatible, lightweight & waterproof design (IP67) makes it perfect for daily adventures — rain or shine. Ideal for active dogs or escape artists, this is perfect for hiking, traveling, and everyday walks, thanks to its long-life battery that works up to 14 days on one charge.
  • Smart alerts and custom Geo-Fence zones notify you instantly if your pet wanders too far.
  • Built-in pet owner community lets family & friends monitor your dog’s safety too — free and instant.

Overview

  • Brand : PETLOC8
  • Special Feature : Alert Notification, Geo-Fence, Real Time Tracking, Waterproof (IP67) and collar-compatible device
  • Connectivity Technology : 4G LTE CAT 1, Bluetooth, Wi-Fi
  • Supported Application : Petloc8 app, iOS, Android
  • Specific Uses For Product : Dog Tracking

Benefits

Nourishing
Hydrating
Soothing

Won't clog pores
Lightweight

Dog GPS Tracker - Real-Time Location Tracking Device with App - Smart Alerts & Geo-Fence - Collar-Compatible, Waterproof - Long-Life Battery - 4G Built-in SIM - iOS & Android (Subscription Required)

Our signature formula contains only the best ingredients, selected for max benefits to the skin.

Natural ingredients

Each product is made with carefully chosen ingredients that focus on your skin's health and glow. Every ingredient is picked for its effectiveness, helping you achieve the best results in your skincare routine.

Tested for safety

We prioritize safety in every product we create, ensuring peace of mind for you and your loved ones. Each item undergoes thorough testing, so you can trust that you're using safe and reliable solutions every day.

Fragrance free

Our products are fragrance-free, designed for those who prefer a gentle touch without added scents.

FRESH

Expert endorsed

FOR SENSITIVE SKIN

Vitamin rich

The best skincare routine is the one you can stick to. This formula feels so good, staying consistent won't be a chore.

Pairs well with